Monday, January 20, 2014

Raise the roof

We now have a roof to protect the interior of the house from the rain.  These pictures show the completed roof, the third floor great room, Ashley's craft room, and a full bathroom.  The roof has a 3/12 pitch which is the minimum slope allowed to be able use shingles.  The last two pictures show the "sturdi floor" plywood that will be the base for the Duradek roof top terrace flooring.









Saturday, January 11, 2014

3rd Floor Framing

The third floor has been framed and these pictures will give you a better idea of the final elevation.  This floor will include our great room, Ashley's craft room, and a full bathroom.  A french door will lead out to a rooftop terrace where we will have outdoor furniture and plantings.  The great room will be bathed in light will a total of 8 storefront style fixed windows as well as the glass french door.