Friday, December 27, 2013

3rd Floor View

The 3rd floor has gone up and we have an awesome view.  The area to the back of the house is Inman Park, and we have a wintertime partial view of the Atlanta skyline toward the front.  I helped the guys raise the 15 foot main wall which will anchor our great room.  The 2x6 wall was extremely heavy, which became quite the precarious experience, pushing it upward toward the edge of the house.









Sunday, December 22, 2013

2nd Floor Framing

The second floor framing has now been completed.  On this floor, we will have the master bedroom/bath, and two additional bedrooms with a jack and jill bathroom.  We will also have our laundry room off of the hallway.  The front of the house will include a balcony that'll be accessible from the master bedroom. One of the pictures below offers the view from the balcony.











Sunday, December 15, 2013

1st Floor Framing

The first floor framing has gone up.  These new walls allow us to get a better feel for the kitchen and dining room layout.  We will have a two-car garage at the front of the house with the main door entry just off to the left.










Friday, December 6, 2013

Backfill and garage slab

The excavators backfilled around the house and built up the 20' x 20' area where the garage slab will be poured.  The concrete company then prepped the slab, had it inspected by the city, and poured a 5" garage floor.  Before it totally dried I left a little note from the soon to be homeowners.