Friday, December 6, 2013

Backfill and garage slab

The excavators backfilled around the house and built up the 20' x 20' area where the garage slab will be poured.  The concrete company then prepped the slab, had it inspected by the city, and poured a 5" garage floor.  Before it totally dried I left a little note from the soon to be homeowners.











No comments:

Post a Comment