For the delivery of drywall, we had to use a boom to drop the pieces on the second and third floors. The boom operator was extremely precise and would raise a bundle of drywall through the third floor french door, while a second person unloaded and scattered the pieces throughout each floor. We ordered 250 pieces of 4' x 12' x 1/2" regular drywall, 80 pieces of 4' x 8' x 1/2" mold resistant board (bathrooms and basement), and 12 pieces of 4' x 10' x 5/8" board for the garage ceiling. They scattered 72 total pieces of drywall on the third floor, 123 pieces on the second floor, 80 pieces on the first floor, 12 pieces in the garage, and 45 pieces in the basement. The 45 pieces for the basement had to be carried down by hand.